Once the contract manager confirms that the work defined in the contract has been completed, the website is handed over to the customer. However, please make planned documents and plan to include special requirements in the contract.
Completed drawing (or manufacturing and installation) for consultants and professional contractors and contractors. Or constructed building information model
Elevator, escalator, lifting equipment, cradle system, boiler and pressure vessel equipment test certificate
Permission to store chemicals and gases, permission to extract groundwater from underground wells
If building information modeling (BIM) is used, communicating the public data environment to the employer, including final publication information and archives that provide a record of all activities in the public data environment during the project I can. If not already done, the employer should appoint an asset information manager to manage the information.
As contractor compensation is discontinued after actual completion, it is necessary to develop a new comprehensive insurance contract.
As contractors no longer take responsibility for safety, we need to implement their own security arrangements.
When the customer's facility management team takes over the operation of the facility, it is necessary to inspect and document the equipment and fuel and release or purchase the tools and spare parts.
If soft landing frames are used, there may be additional requirements to ensure a smooth transition from building to occupation, such as after-care services and providing technical guidance. These additional services should be included in the booking document and the contract. For details, see soft landing.
Completion - Once the building begins to shape, the contractor may need to hand over some of the building to the customer. Plan the actual date of delivery and identify solutions that are unresolved related to construction projects. The required notification period varies from location to location, but usually you need appropriate notice to prepare that area or other supplemental document. Customers should be able to accept the correct usage of the building. As a result, the architect usually checks the area, ensures that the work meets the appropriate material and process criteria and that all services and equipment are functioning properly. Actual record of actual building. At this stage, the contractor has effectively completed the construction phase and is not responsible for the insurance of the building or its construction.
Construction projects can be carried out after the customer / owner (hereinafter referred to as "customer") meets the prerequisites such as decision-making throughout the project, funding, land (land) and necessary approval of the relevant organization I will. Land Use and Project Objectives After meeting the criteria for establishing a project, the client either submits the design to the designer for selection or provides the design and complete building specifications. Projects can be run in various ways. One approach is when a customer creates a project under a new company and builds various departments within the company such as design, development, construction, and operation, and can fully control and execute the project. Or, depending on many things such as customer's status,