Economic Impact Analysis of the Central Florida High Speed Railway System Introduction The High Speed Railway (HRL) system has been used mainly in countries such as Japan and France since 1964 to 1984. Recently, America attracts attention in high-speed railway. The same can be said about high-speed trains. The proposed system is extended from Miami to Orlando and ends in St. Petersburg / Tampa. Since the Shinkansen runs at speeds of up to 220 miles per hour, it takes approximately 5 hours for Miami to travel quickly from downtown to Orlando.
The United States is currently constructing a high-speed rail (California high-speed rail) in California, Texas Central Railway Company, Pacific Northwest, Midwest and Southeast. The high-speed rail project is also an advanced plan. As an upgrade to the high-speed northeastern corridor. Brightline, a private high-speed railroad company in Florida, commenced operation along part of the route in early 2018. So far the speed was limited to 127 km / h (79 mph), but the maximum speed is 201 km / h (125 mph). MPH)
The national plan of high-speed rail began in the early 1990's, Qinhuangdao-Shenyang passenger railway, the country's first high-speed rail line, was completed in 1999 and entered into commercial operation in 2003. This line can accommodate commercial trains running at 200 km / h (120 mph) per hour. The planners also studied German super high speed magnetic levitation technology and built a Shanghai linear motor car located on a 30.5 km (19.0 mile) track connecting the city's financial district and major international airports. The linear motor car started operation at the maximum speed of 431 km / h (268 mph) in 2004, and it is still the fastest high-speed line in the world. However, linear motor cars are not used nationwide, and all subsequent extensions used traditional railway high-speed railroads.